Wednesday, June 23, 2010

Phase I, continued….

 

We’re not seeing a whole lot of progress these days because they’re mostly working on tiling the roof and doing the electrical wiring and stuff… but here are a few more current shots.

This is how the east wall of the garage used to look… we had them take the water heater out and put it behind the house, because that fridge conveniently fits right into that little cubby!!
2010_0616_1 

See???  :)
2010_0621_1549

The door you see on the left will be taken out and replaced with an arched entryway.  The metal shelving in the pantry will be replaced with wooden shelves.  Lots and lots of shelves.  :)

Here’s where we put the water heater… they’re going to drywall & stucco that to match the house.  (This little closet also houses the sprinkler system control box.)
2010_0616_1433

And this is our awesome new front door.  Brittany calls it our DUNGEON DOOR!  Buaaahhhahahaha…. :)  
2010_0621_1551 

Here is what the front looks like from the street at this point.
2010_0621_2 2010_0621_3 

The dungeon door….

This is around the back… the other side of the new playroom.  That white door used to be the front door.
2010_0621_4

And there is the back of the house… with the new hot water heater shed that isn’t finished yet.  The lawn looks awful… but hey, look at that cool gas grill!  Oh… also, we’re planning to eventually make a roof over that patio.  That will be after Phase III.
2010_0621_5